Fork the plan

Explorer

This page runs the same model the site is built from, in your browser. Move an assumption and every consequence is recomputed, including the day-by-day simulation of Venus's air and every physics check. The link in your address bar keeps your variant. To change anything else, edit data/assumptions.yaml and run pnpm calc.

Ouroboros Foundry
60 d
30 dplan value120 d
1,000 t
100 tplan value10,000 t
100 MJ/kg
30 MJ/kgplan value300 MJ/kg
Helios Lattice
7.00 × 10¹⁹ W
4.0 × 10¹⁹ Wplan value1.0 × 10²⁰ W
40%
25%plan value50%
50%
30%plan value70%
Hesperus Veil
0.01
0.002plan value0.1
Photonic Exhaust
5.00 × 10¹⁹ W
3.0 × 10¹⁹ Wplan value7.0 × 10¹⁹ W
2,000 K
1,000 Kplan value3,000 K
Water
1.00 × 10²⁰ kg
3.0 × 10¹⁹ kgplan value2.0 × 10²⁰ kg
27%
17%plan value35%

Venus is Earth-like in time

The day-by-day simulation reaches Earth-like air on 30 September 2036, 92 days before the deadline. 9 of 12 physics checks pass.

ConsequencePlanThis variant
Earth-like: warm, 0.25 bar of oxygen, CO₂ under 600 ppm30 September 203630 September 2036
Energy delivered from outside Venus7.7 × 10²⁷ J7.7 × 10²⁷ J
Energy the Lattice delivers from full power to the deadline7.8 × 10²⁷ J7.8 × 10²⁷ J
Spare supply, before counting the Ring's recovered energy1.7%1.7%
Spare supply once the Ring powers the Railheads28%28%
Foundry reaches full scale22 June 203322 June 2033
Foundry can build the Hesperus Veil in one doubling period2 March 20322 March 2032
The Clear Rain begins: near-surface air below 304 K19 January 203419 January 2034
Frost Towers bring CO₂ down to the target9 May 20369 May 2036
Helios Lattice film area5.1 × 10¹⁶ m²5.1 × 10¹⁶ m²
Emitter area installed (sized for the peak)5.5 × 10¹³ m²5.5 × 10¹³ m²
Heat-pump work to cool Venus, day by day, Frost Towers included3.5 × 10²⁷ J3.5 × 10²⁷ J
Veil mass5.4 × 10¹¹ kg5.4 × 10¹¹ kg
Global-average ocean depth217 m217 m
Share of Ceres's water shipped39%39%

Physics checks

  • Open

    Version 2: a statite Veil 137,000 km sunward of Venus can hover

    Light pressure (0.0174 m/s²) and Venus's gravity both point toward Venus; the shade falls with 0.0347 m/s² and reaches Venus in about 1 day.

  • Pass

    The Veil's station balances gravity, light pressure and orbital motion

    At 1.110 million km sunward the residual is 0.0e+0 m/s², nil; slats trim the small, slow drift of this unstable point by tilting.

  • Pass

    The heat pump never beats Carnot

    Pump work 2.83e+27 J for 5.28e+26 J of heat, at least the 9.05e+26 J Carnot demands even if every joule left from 737 K.

  • Pass

    The Forges make the cap graphite before sealing ends

    4.17e+17 kg of graphite by the end of sealing; the caps need 3.00e+17 kg.

  • Pass

    The last Brick arrives before the deadline

    Last launch 2035.80, transfer 1.15 yr, last arrival 2036.95.

  • Pass

    The Ring recovers more power than the Railheads draw

    Ring 7.22e+19 W recovered against 5.57e+19 W drawn by the Railheads.

  • Open

    The Ring can pass the catch's net braking force to Venus

    Catching half the Bricks eastbound and half westbound cancels the twist, not the force: 8.1e+15 N remains along Venus's orbital motion. An orbital ring has no stiff way to hand an in-plane force to the planet; its spare lift is 3.0e+13 N, 266 times too little.

  • Open

    The Ring can carry the force of lowering the ice on tethers

    Lowering 2.17e+12 kg/s needs at least 4.7e+15 N; the rotor's spare lift is 3.0e+13 N, 154 times too little.

  • Pass

    The Foundry can afford the Veil by the date it must close

    Foundry machinery at the Veil's close date: 2.17e+12 kg; Veil: 5.41e+11 kg.

  • Pass

    The Foundry can afford the Helios Lattice by the date it reaches full power

    Foundry at full power date: 1.34e+14 kg; Lattice: 5.14e+13 kg.

  • Pass

    The simulated atmosphere is Earth-like by the deadline

    The day-by-day simulation reaches Earth-like conditions on 2036-09-30; the deadline is 2036-12-31.

  • Pass

    The energy budget closes: supply covers demand

    Lattice supply 7.79e+27 J against demand 7.66e+27 J: 2% spare before the Ring's recovered energy, 28% once the Ring powers the Railheads.